Structural Steel Guard Rail on 29th Floor

TWS Calgary has created the guard rail for the 29th floor of this new hotel in down town Calgary.

Let’s be honest, it’s on the roof and yes it’s a daunting view but TWS Calgary’s team is used to constructing structural steel at heights.

The vertical columns made of 6″X10″ HSS are 8 feet tall and tied in around the perimeter with 4X4  girders. These items are pre-built in the TWS shop, transported to site and then flown into place on the 29th floor with a Wolff 116B US crane.

It’s a precarious job that takes skill and finesse and once fenced in will keep those using the roof in the future, safe and sound.

Have a structural steel or miscellaneous metals job that required 3D scanning, drafting or engineering? Give us a call for an immediate quote. 403-273-7717
.

Slide
TWS Calgary Structural Steel

TWS Calgary has created this guard rail for the 29th floor of a new hotel in down town Calgary.

TWS-Structural-Steel-Calgary-Rooftop-Guard-Rail

 

Continue reading...

New Mezzanine for Calgary Building

A mezzanine is an intermediate floor (or floors) in a building which is open to the floor below. It is placed halfway up the wall on a floor which has a ceiling at least twice as high as a floor with minimum height.

TWS Calgary is installing these huge structural steel beams for a Calgary client in their new office building. TWS ‘s knowledgeable and experienced team are certified journeyman and qualified with CWB (Canadian Welding Bureau) certification and can build, modify and/or repair to your specifications. Our large mobile fleet is fully equipped for virtually any on-site structural steel fabrication.

Get in touch for a FREE Quote on your next big project. 403-273-7717

Continue reading...

Structural Steel Hopper Installation

TWS Calgary just manufactured and installed these huge hoppers for a local company.

A hopper is a large, pyramidal or cone shaped container used in industrial processes to hold particulate matter or flow-able material of any sort, like dust, gravel, nuts, seeds etc. and can then dispense these from the bottom when needed.

After constructing these steel hoppers had to be installed and secured on site with a structural frame work anchored to heavy metal footings.
.

 

Continue reading...

Sunny Side Storm Water Lift Station Upgrade

What is a storm water lift station?

Stormwater lift stations are used to manage stormwater within a given area by pumping water away from low-lying areas. The Sunny Side lift station will collect and then re-direct stormwater through underground piping to outfall structures located at the Bow River.

So basically the station will collect flood water and redirect it to keep flooding water from continuing into residential areas in Sunny Side.

The Welding Shop Calgary provided some structural steel modifications with a number of steel stairs and landing areas.

Give us a call for a quote on all your large structural steel projects.

.

Continue reading...

Bonnybrook Wastewater Treatment Plant

The Bonnybrook plant serves over 600,000 citizens and processes approximately 376,000 m3 (491,789 cu. yd.) of sewage a day.

The Bonnybrook Wastewater Treatment Plant is the largest of Calgary’s three wastewater treatment plants. Originally built in the 1930s, Bonnybrook has been through many modifications and upgrades over time to increase its treatment capacity to meet the needs of the growing city. Bonnybrook serves the communities north of Glenmore Trail in the Calgary, as well as Cochrane, Airdrie and the Elbow Valley.

TWS Welding was tasked with installing the new monorail or crane beam for the Bonnybrook Water Treatment Plant. It required some structural steel fabrication at the shop and on site welding from our crew to complete the job.

For estimates please get in touch at 403-273-7717.
.

Continue reading...